Tuesday, December 13, 2011

Scout Report - December 13, 2011

This week's Scout Report:
 https://sites.google.com/site/tuscaloosatrend/scout-reports?pli=1

It was tough week for the Austin Chalk drillers:

Swift Exxon Corp 10-1:
16882'; TSTD BOP'S 12/5/11; UNABLE TO GET PAST LNR TOP; PUMPED KILL MUD; PU NEW DIR ASSY, TIH TO LNR, UNABLE TO TRIP THROUGH LNR; PUMPED HEAVY MUD DOWN BACK SIDE IN ATTMT TO PRESSURE UP CSG TO GET WELL MOVING, W/ NO PROGRESS; PUMP KILL MUD; PU NEW DOWNHOLE TOOLS, DRLD TO 16822'; DOWNHOLE TOOL FAILURE; KILL WELL;
Antinum Indigo 16-1:
17262'; DRLD TO 17262'; DRILL STRING TWISTED OFF ABOVE BHA; KILLED WELL; TIH W/ FISHING TOOLS TO TOF @ 14926'; LATCH ON TO FISH, POOH & L/D PARTIAL FISH; TSTD BOP'S 12/9/11; TRIP IN & OUT HOLE W/ IMPRESSION BLOCK; TIH W/ BHA TO 2700', INSTALLED ROTATING HEAD; TIH TO 15008' & TAGGED UP; STAGE OUT OF HOLE TO 6500' & ESTABLISH CIRCULATION; CBU;

No comments:

Post a Comment